Effective July 4, 2025, the Davis-Bacon wage determination applicable to building, heavy, and highway construction in certain portions of Brevard County, Florida (Cape Canaveral Air Station, Patrick Air Force Base, Kennedy Space Center, and Malabar Radar Site) will be withdrawn. The current version of this wage determination is FL20250001. For any contract entered into on or after July 4, 2025 or that otherwise requires the incorporation of a revised or updated wage determination on or after July 4, 2025 under 29 CFR 1.6(c)(2), please incorporate the appropriate general wage determination for Brevard County—currently FL20250196 for building construction, FL20250106 for heavy construction, FL20250240 for highway construction, or FL20250055 for residential construction. For questions, please contact [email protected].
Last Updated: Jun 26, 2025